{"id":21616,"date":"2026-04-23T14:54:24","date_gmt":"2026-04-23T09:54:24","guid":{"rendered":"https:\/\/pakalerts.net\/english\/?p=21616"},"modified":"2026-04-23T14:54:24","modified_gmt":"2026-04-23T09:54:24","slug":"lng-availability-expected-to-end-peak-time-load-management-says-power-division","status":"publish","type":"post","link":"https:\/\/pakalerts.net\/english\/?p=21616","title":{"rendered":"LNG Availability Expected to End Peak-Time Load Management, Says Power Division"},"content":{"rendered":"<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"81cb6e9f-c15b-49ed-a0b4-251ffdaaf161\" data-message-model-slug=\"gpt-5-3\" data-turn-start-message=\"true\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"markdown prose dark:prose-invert w-full wrap-break-word light markdown-new-styling\">\n<p data-start=\"1062\" data-end=\"1269\"><strong>Islamabad: A spokesperson for Pakistan&#8217;s power division has stated that the availability of LNG is expected to help eliminate load management during peak hours and improve electricity supply.<\/strong><\/p>\n<p data-start=\"1271\" data-end=\"1490\">According to the spokesperson, due to provincial demand last night, water was released from dams, resulting in the generation of 4,950 megawatts of electricity during peak hours, which helped meet immediate power needs.<\/p>\n<p data-start=\"1492\" data-end=\"1741\">He further explained that the total hydropower generation capacity in the country stands at 11,500 megawatts; however, current production remains around 6,000 megawatts below its full capacity, primarily due to lower water demand from the provinces.<\/p>\n<p data-start=\"1743\" data-end=\"1957\">The spokesperson added that limited water demand is affecting hydropower generation, but the availability of LNG will reduce pressure on the energy system and contribute to ending load management during peak hours.<\/p>\n<p data-start=\"1959\" data-end=\"2054\" data-is-last-node=\"\" data-is-only-node=\"\">\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"z-0 flex min-h-[46px] justify-start\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: A spokesperson for Pakistan&#8217;s power division has stated that the availability of LNG is expected to help eliminate load management during peak hours and improve electricity supply. According to the spokesperson, due to provincial demand last night, water was released from dams, resulting in the generation of 4,950 megawatts of electricity during peak hours, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":21617,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"googlesitekit_rrm_CAowgLK2DA:productID":"","_sitemap_exclude":false,"_sitemap_priority":"","_sitemap_frequency":"","jnews-multi-image_gallery":[],"jnews_single_post":{"subtitle":""},"jnews_primary_category":[],"jnews_social_meta":[],"footnotes":""},"categories":[47,46,36],"tags":[6629,11946,7378,9859,11945,3636],"class_list":["post-21616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-important-news","category-latest","category-pakistan","tag-electricity-production","tag-energy-pakistan","tag-hydropower","tag-lng","tag-load-management","tag-power-division"],"_links":{"self":[{"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=\/wp\/v2\/posts\/21616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21616"}],"version-history":[{"count":1,"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=\/wp\/v2\/posts\/21616\/revisions"}],"predecessor-version":[{"id":21618,"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=\/wp\/v2\/posts\/21616\/revisions\/21618"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=\/wp\/v2\/media\/21617"}],"wp:attachment":[{"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pakalerts.net\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}